  一、可行性分析(Feasibility Analysis)
  在考慮安裝廠房屋頂光伏之前,需要進行可行性分析。主要包括產(chǎn)權(quán)問題、屋面位置的選取、傾角與朝向的確定,以及陰影問題的評估等。通過可行性分析,確保屋面的特征與電池板的性能相匹配,以達到更高的發(fā)電效益。Before considering installing photovoltaic panels on the factory roof, a feasibility analysis is needed. It mainly includes issues such as property rights, selection of roof location, determination of inclination and orientation, and assessment of shadow problems. Through feasibility analysis, ensure that the characteristics of the roof match the performance of the battery panels to achieve higher power generation efficiency.
20230630110743547
  以下是可行性分析的具體事項:
  1、產(chǎn)權(quán)問題(Property Rights Issue)
  工商業(yè)屋頂安裝光伏發(fā)電的一個突出的問題是屋頂或場地產(chǎn)權(quán)問題,由于光伏發(fā)電使用壽命長,投資成本也高。在產(chǎn)權(quán)不明晰的場地或屋頂建設(shè)光伏發(fā)電站會給電站建成后的使用和收益產(chǎn)生很多不確定因素。因此在建設(shè)工商業(yè)電站前期一定要充分做好場地產(chǎn)權(quán)、靜態(tài)投資和運維投入、收益分配、風(fēng)險承擔(dān)等一系列可行性分析,制定好切實可行的解決方案。One prominent issue in installing photovoltaic power generation on industrial and commercial roofs is the problem of roof or site property rights. Due to the long service life of photovoltaic power generation, the investment cost is also high. Building a photovoltaic power station on a site or roof with unclear property rights will bring many uncertain factors to the use and income after the power station is completed. Therefore, in the early stage of building an industrial and commercial power station, a series of feasibility analyses such as site property rights, static investment and operation and maintenance input, income distribution, and risk assumption must be fully done, and a practical solution must be formulated.
  2、屋頂結(jié)構(gòu)評估(Roof Structure Assessment)
  在進行光伏安裝之前,需要對廠房屋頂?shù)慕Y(jié)構(gòu)進行評估,以確保其能夠承受光伏系統(tǒng)的重量和負荷。這包括檢查屋頂?shù)膹姸取⑵秸群头€(wěn)定性等因素。如果屋頂結(jié)構(gòu)存在問題,則需要進行修復(fù)或加固,以確保其能夠安全地承載光伏系統(tǒng)。Before installing photovoltaic panels, the structure of the factory roof needs to be evaluated to ensure that it can bear the weight and load of the photovoltaic system. This includes checking factors such as the strength, flatness, and stability of the roof. If there are problems with the roof structure, it needs to be repaired or strengthened to ensure that it can safely carry the photovoltaic system.
  3、屋頂支架(Roof Bracket)
  建筑屋頂主要有彩鋼瓦、陶瓷瓦、鋼混等幾種,彩鋼瓦分為直立鎖邊型、咬口型、卡扣型、固定件連接型。前兩種需要專用轉(zhuǎn)接件,后兩種需要打孔固定;陶瓷瓦屋面可以使用專用轉(zhuǎn)接件,也可以不與屋面固定,利用自重和屋面坡度附著其上;鋼混結(jié)構(gòu)屋面需要制作支架基礎(chǔ),基礎(chǔ)與屋面可以生根也可以不生根,關(guān)鍵考慮屋面防水、抗風(fēng)載能力、屋面設(shè)計荷載等因素。There are several types of building roofs, mainly including color steel tiles, ceramic tiles, and reinforced concrete. Color steel tiles are divided into standing seam type, snap-lock type, buckle type, and fixed part connection type. The first two types require special adapters, and the latter two types need to be fixed by drilling holes; for ceramic tile roofs, special adapters can be used, or they can be not fixed to the roof and attached to it by using self-weight and roof slope; for reinforced concrete structure roofs, bracket foundations need to be made. The foundation and the roof can be rooted or not. Key factors to consider include roof waterproofing, wind load resistance ability, and roof design load.
anli
  4、環(huán)境因素(Environmental Factors)
  在選擇支架系統(tǒng)時,還需要考慮當(dāng)?shù)氐沫h(huán)境因素,例如風(fēng)雪、降雨等自然災(zāi)害。為了保護光伏面板和支架系統(tǒng),應(yīng)該根據(jù)當(dāng)?shù)氐沫h(huán)境條件選擇耐用、抗風(fēng)雪、防腐蝕、抗銹蝕等特性的支架系統(tǒng)。同時,在支架系統(tǒng)的設(shè)計和安裝過程中,需要考慮當(dāng)?shù)氐娘L(fēng)速、降雨量、積雪深度等因素,以確保支架系統(tǒng)能夠在惡劣天氣條件下穩(wěn)定運行,并最大程度地減少損壞和維修成本。When choosing a bracket system, local environmental factors such as natural disasters such as wind, snow, and rain also need to be considered. In order to protect photovoltaic panels and bracket systems, a bracket system with characteristics such as durability, resistance to wind and snow, corrosion resistance, and rust resistance should be selected according to local environmental conditions. At the same time, in the design and installation process of the bracket system, factors such as local wind speed, rainfall, and snow depth need to be considered to ensure that the bracket system can operate stably under harsh weather conditions and minimize damage and maintenance costs.
  二、項目預(yù)算(Project Budget)
  廠房屋頂光伏的安裝需要一定的經(jīng)費,預(yù)算需要考慮光伏電池板的成本、構(gòu)架及支架的價格以及安裝費用(如施工費、運輸費用等),同時還需要根據(jù)項目的大小和規(guī)模來制定詳細的財務(wù)計劃和風(fēng)險管理方案,確保項目經(jīng)濟效益最大化。The installation of photovoltaic panels on factory roofs requires a certain amount of funds. The budget needs to consider the cost of photovoltaic panels, the price of frameworks and brackets, and installation costs (such as construction costs, transportation costs, etc.). At the same time, a detailed financial plan and risk management plan need to be formulated according to the size and scale of the project to ensure the maximization of project economic benefits.
  三、政策和環(huán)境法規(guī)(Policies and Environmental Regulations)
  各地為了推動分布式光伏發(fā)展,紛紛出臺省級、市級甚至縣級的扶持政策。項目開發(fā)人員在項目開發(fā)前期需提前需熟悉這些政策,作為目前還需政府補貼發(fā)展的光伏產(chǎn)業(yè),補貼政策的好壞直接影響了分布式的收益,因此當(dāng)?shù)卣吆玫姆植际巾椖恳藘?yōu)先開發(fā)。In order to promote the development of distributed photovoltaic power, various places have successively introduced support policies at the provincial, municipal, and even county levels. Project developers need to be familiar with these policies in advance in the early stage of project development. As the photovoltaic industry still needs government subsidies for development, the quality of subsidy policies directly affects the income of distributed projects. Therefore, distributed projects with good local policies should be developed preferentially.
  配電設(shè)備是光伏電站選擇并網(wǎng)方案的根據(jù)之一,主要考查內(nèi)容有:1) 廠區(qū)變壓器容量、數(shù)量、母聯(lián)、負荷比例等;2) 廠區(qū)計量表位置、母排規(guī)格、開關(guān)規(guī)格型號等;3) 廠區(qū)是否配備獨立的配電室,是否配電設(shè)備是否有備用的間隔,如沒有是否可以壓接母排;4) 優(yōu)先選擇變壓器總?cè)萘看螅摵杀壤蟮挠脩簦?) 查看進線總開關(guān)的容量,考慮收益問題,光伏發(fā)電系統(tǒng)的輸出電流不宜大于戶用開關(guān)的容量;6) 以走線方便節(jié)約的原則,考慮逆變器、并網(wǎng)柜的安裝位置。Distribution equipment is one of the bases for photovoltaic power stations to choose grid-connected schemes. The main inspection contents are: 1) Transformer capacity, quantity, bus tie, load ratio, etc. in the plant area; 2) Location of the plant area meter, busbar specifications, switch specifications and models, etc.; 3) Whether the plant area is equipped with an independent power distribution room, and whether there is a spare bay for power distribution equipment. If not, can the busbar be crimped? 4) Priority is given to users with large total transformer capacity and large load ratio; 5) Check the capacity of the main incoming switch. Considering income issues, the output current of the photovoltaic power generation system should not be greater than the capacity of the household switch; 6) According to the principle of convenient wiring and saving, consider the installation location of inverters and grid-connected cabinets.
  • TEL:0531-82390078
  • TEL:18805312017
  • MAI:sdzdny001@163.com

掃一掃方便咨詢我們

截屏,微信識別二維碼

微信號:18805312017

主站蜘蛛池模板: 国产免费破外女真实出血视频 | 亚洲精品有 | 午夜成人理论片A片无码老牛 | 91靠逼视频 | 国产开操网 | 亚洲一区二区三区精品视频 | av免费网站 | 欧美日本一道免费一区三区 | 日韩精品无码一级A片-百度贴吧 | 日韩欧美视频免费观看 | 成人亚洲区 | 亚洲AV秘 无码一区二区三区 | 亚洲免费国产综合网免费观看 | 涩涩屋视频在线观看 | 日韩精品极品视频在线观看免 | JIZZJIZZWWW中文老师 | 三级片在线观看 | 日韩免费无码 | 中文字幕久久在线 | 久热精品视频 | 亚洲成人视频一区二区三区 | 日本韩国一区二区三区 | 亚洲乱亚洲乱亚洲乱无码 | 午夜私人成年影院在线观看 | 国产麻豆免费在线 | 亚洲 日本 欧美 激情 | 日韩伦理电影中文字幕乱码无码 | 亚洲第一区在线 | 国产精品一区在线免费观看 | 亚洲一区二区在线 | 免费看一区二区三区A片 | 91香蕉一区二区三区在线观看 | 亚洲AV成人精品午夜一区二区 | 无码中文字幕乱码三区日本视频 | 日韩国品一 | 成人一区二区av | 91精品欧美激情在线播放 | 黄色视频果冻传媒在线播放 | 亚洲成高清中 | 三级片网络 | 在线视频一二区 |